# FlowAI Pilot Scope — Reusable Template

> Replace bracketed sections with the buyer's specifics. Limit final document to ~3 pages. Length here is a filled example anchored to the Brazilian hospital-group supplier-DD scenario.

> **Editable discussion template only:** The workflow scenario, deliverables, timeline, success metrics, staffing, integrations, and commercial terms below are placeholders for negotiation. They do not describe current FlowAI features, a standard pilot, an agreed implementation, or a product or service commitment. Confirm availability and terms with FlowAI before sharing this document as a proposal.

---

### Pilot Scope Document — v0.1

- **Buyer:** [Buyer Legal Name]
- **Vertical track:** [Healthcare – Hospital Group Supplier DD / Fintech – Embedded Finance KYC / etc.]
- **Pilot scope owner (FlowAI):** [Pedro Santiago / assignee]
- **Pilot scope owner (Buyer):** [Name, role]
- **Pilot start date:** [Target]
- **Pilot end date:** 8 weeks from start. Annual contract conversion gate triggers at week 6.

---

### 1. Objective

FlowAI runs [one narrow, high-signal workflow] against [Buyer]'s existing manual review process and produces a measurably higher-throughput outcome without changing the buyer's regulatory burden or introducing buyer-side implementation work.

Single sentence. If the pilot can't be defended in one sentence, it isn't a pilot.

---

### 2. Vertical definition (the pain being attacked)

Vertical: [Hospital group supplier DD / Embedded finance KYC / etc.]

Buyer's current process — exemplary:
- Procurement / onboarding collects [supplier / customer] documentation.
- Compliance team manually checks: [regulatory registries, ownership disclosures, sanctions overlap].
- Volume: ~[N] reviews per year, average manual cycle [N] business days, high reviewer variance.

The visible problem the pilot addresses: throughput + consistency in third-party / counterparty risk review. Adjacent workflows explicitly out.

---

### 3. IN-SCOPE (what FlowAI builds/runs during the pilot)

One workflow: [Supplier-DD dossier generation / KYC triage / etc.], end-to-end.

| Step | FlowAI output |
|---|---|
| Document intake | [Supplier package + corporate filings / customer onboarding documents] |
| Data extraction | [CNPJ, QSA, ownership tree / passport, ID, address, source-of-funds] |
| Sanctions / registry screening | [OFAC, UN, EU, ANVISA, CADE, CVM, state-level registries] |
| Risk scoring | Composite FlowAI risk score 0–100, calibrated against buyer's incident history where available |
| Routing | Tier review queue — Low / Medium / High — for buyer's compliance team final disposition |

Deliverables to [Buyer]'s compliance team:
- 1 [supplier / customer] risk dossier per reviewed entity (PDF + structured JSON).
- FlowAI risk score recommendation + supporting evidence.
- Concise review notes for the buyer's manual reviewer.

---

### 4. OUT-OF-SCOPE (explicitly not built during the pilot)

Adjacency risks scope creep — the buyer will coalition-expand this. Lock it down at week 0.

- [Vertical-adjacent data the pilot does NOT touch — clinical, patient, employment, etc.].
- New geography expansion beyond [region].
- Adjacent buyers within the same vertical (sister [hospital groups / business units]) — addressed post-pilot as expansion.
- Customer-facing surfaces for [Buyer]'s downstream users.
- Modifications to [Buyer]'s existing procurement / lifecycle / ERP systems.

If a buyer asks "can you also do X" mid-pilot: scope-2 commercial conversation, started in parallel.

---

### 5. Success criteria (measured jointly at week 4 and week 8)

Primary metric: concordance between FlowAI risk score and [Buyer]'s manual reviewer's final disposition.

- Pilot pass: ≥ 85% concordance at week 8 within +/-1 tier band; ≥ 95% within +/-2 tier band.
- Pilot fail threshold: < 70% concordance within +/-2 tier band. Triggers scope review, not termination.

Secondary metrics:
- Cycle time reduction: FlowAI dossier ready in ≤ 24 hours, vs. [Buyer]'s manual baseline of [N] business days.
- Reviewer coverage: 100% of pilot entities reviewed by FlowAI pre-review; reviewer override rate tracked at dossier level.

Buyer engagement metric: ≥ 80% of pilot entities reviewed by [Buyer]'s team within 5 business days of dossier delivery.

---

### 6. Data, systems, integrations

Data FlowAI pulls (no buyer-side implementation work required):
- Public [country] registries relevant to the vertical.
- International sanctions: OFAC SDN/SDNT, UN consolidated list, EU consolidated list.
- News and adverse media ([PT-BR / EN / both]), configured to buyer's vertical risk taxonomy.

Data FlowAI does NOT pull during the pilot:
- [Buyer]'s internal clinical / financial / contract records.
- Patient data, PHI, LGPD-protected records.
- [Buyer]'s existing manual reviews (used only as validation benchmark at week 8, transferred via agreed sample pack).

Integration depth during pilot: none on [Buyer]'s production systems. All pilot data flows through FlowAI's intake portal + buyer email. The pilot proves the engine, not the integration.

---

### 7. Roles

FlowAI side:
- Pilot scope owner: [Pedro / assignee] — accountable for deliveries, weekly status, escalation.
- Engineering / agent ops: handles all workflow execution.
- Reviewer-pair compliance support: one FlowAI analyst on standby [9–18 BRT / buyer business hours] for dossier-reasoning questions.

Buyer side:
- Pilot sponsor (executive-level): single internal champion, owns the GO/NO-GO at week 6.
- Pilot operations lead: completes validation review on each pilot entity within 5 business days.
- Compliance team reviewers: 2–3 named reviewers who validate FlowAI dossiers against their manual baseline.

---

### 8. Timeline (8 weeks, with structural checkpoints)

| Week | Deliverable | Gate |
|---|---|---|
| 0 | Kickoff — buyer signs scope doc; sample pack exchanged ([N] historical entities + outcomes) | G0: Agreement on baseline |
| 1 | FlowAI back-tests historical sample; delivers calibration report | Calibration report accepted |
| 2 | First live dossiers begin; cadence ~[N]/week | G1: First dossier delivered |
| 3–5 | Steady-state: target cadence, mid-pilot calibration + reviewer feedback sessions | Concordance running healthily |
| 6 | Mid-pilot review: conversion go/no-go against metrics | G2: Commercial go/no-go — buyer decides pilot → annual contract |
| 7–8 | Final dossiers + retrospective + agreement on expansion verticals | Pilot close retrospective |

---

### 9. Commercial terms — Founding Pilot Program anchor

- Pilot fee: $[reduce or waive vs annual if strategic value high] for 8 weeks.
- Conversion fee: $[•••] / month, billed monthly, on annual contract. Founding Pilot Program rate locked 12 months from conversion.
- Founding Pilot Program slot allocation: [N of 5 remaining] — once filled, rate moves to standard.
- Payment terms: pilot fee billed at week 1; annual contract billed monthly from conversion week.
- Buyer stop-out: buyer may terminate pilot at end of week 4 with no further obligation. Buyer retains all pilot deliverables.

---

### 10. Conversion criteria (binary — what turns pilot into contract)

- Primary: concordance ≥ 85% within +/-1 tier at week 8.
- Engagement: ≥ 80% reviewer coverage by buyer-side reviewers across pilot run.
- Commercial: buyer-side pilot sponsor signs conversion agreement within 30 days of pilot close.

Fail-state handling: if primary fail threshold (< 70% concordance within +/-2 tier) is hit, FlowAI pays no further pilot fees, delivers final concordance report, parties agree on no-fault pilot close.

---

### 11. Confidentiality & data handling

- Mutual NDA covers pilot scope, data, and outcomes.
- Dossiers generated during pilot are [Buyer]'s confidential records; FlowAI retains anonymized aggregate metrics only.
- Pilot close retrospective jointly authored with 30-day review window prior to publication.

---

### 12. Sign-off

| Role | Name | Signature | Date |
|---|---|---|---|
| FlowAI scope owner | __ | __ | ____ |
| Buyer pilot sponsor | __ | __ | ____ |
| Buyer operations lead | __ | __ | ____ |

---

## Notes for flow owners

- Section 4 (OUT-OF-SCOPE) is the single biggest commercial lever. Buyer-side coalition will try to broaden mid-pilot; this makes that a parallel commercial conversation, not a scope update.
- Section 5 success criteria split conversion from ship. Concordance is a purchasing decision, not a ship decision.
- Section 6 integration depth protects both sides from pretending the integration proof is done when it isn't.

## Reuse instructions

When a new design-partner conversation reaches pilot-scope stage:
1. Pull this document from company docs (`/docs/pilot_scope_template.md`).
2. Replace bracketed sections with buyer specifics; example references stay as illustrative.
3. Hit week-0 calibration sample pack within 5 business days of signing.
